PLN ULP Mentok
PLN ULP Mentok, , Jl R.A Kartini, Kab Bangka Barat, ID
3 ports · IDR2467/kWh ++
Ports at this station
- Available
CCS2
2× · up to 100 kW
- Available
Type 2 (tethered)
1× · up to 7 kW
Station info
- Address
- PLN ULP Mentok, , Jl R.A Kartini, Kab Bangka Barat, Kepulauan Bangka Belitung, Indonesia
- Total points
- 1
- Coordinates
- -2.06011, 105.16688
- Last verified
- 2026-07-26
About this stop
PLN operates this EV charging site in Kab Bangka Barat. It has one charging point with a peak power of 100 kW. Connectors available are CCS (Type 2) and a tethered Type 2 connector. The station is currently operational.
This 100 kW rapid charger is best suited for quick top-ups on longer journeys. A 100 kW charging rate means adding approximately 100 miles of range to a typical EV in about 20 to 30 minutes, depending on the vehicle and battery level. This makes it a practical stop for EV drivers in the region. The cost is IDR2467 per kilowatt-hour, with additional fees potentially applying.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of PLN ULP Mentok.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB