chargevu
3 of 3 available100 kW peakPLN (Indonesia)

PLN ULP Mentok

PLN ULP Mentok, , Jl R.A Kartini, Kab Bangka Barat, ID

3 ports · IDR2467/kWh ++

Ports at this station

  • CCS2

    2× · up to 100 kW

    Available
  • Type 2 (tethered)

    1× · up to 7 kW

    Available

Station info

Address
PLN ULP Mentok, , Jl R.A Kartini, Kab Bangka Barat, Kepulauan Bangka Belitung, Indonesia
Total points
1
Coordinates
-2.06011, 105.16688
Last verified
2026-07-26

About this stop

PLN operates this EV charging site in Kab Bangka Barat. It has one charging point with a peak power of 100 kW. Connectors available are CCS (Type 2) and a tethered Type 2 connector. The station is currently operational.

This 100 kW rapid charger is best suited for quick top-ups on longer journeys. A 100 kW charging rate means adding approximately 100 miles of range to a typical EV in about 20 to 30 minutes, depending on the vehicle and battery level. This makes it a practical stop for EV drivers in the region. The cost is IDR2467 per kilowatt-hour, with additional fees potentially applying.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN ULP Mentok.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN ULP Mentok.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB