chargevu
3 of 3 available100 kW peakPLN (Indonesia)

PLN ULP Muntok

PLN ULP Muntok, , Jl R.A Kartini, Kab Bangka Barat, ID

3 ports · IDR2467/kWh ++

Ports at this station

  • CCS2

    2× · up to 100 kW

    Available
  • Type 2 (tethered)

    1× · up to 7 kW

    Available

Station info

Address
PLN ULP Muntok, , Jl R.A Kartini, Kab Bangka Barat, Kepulauan Bangka Belitung, Indonesia
Total points
1
Coordinates
-2.06011, 105.16688
Last verified
2026-04-23

About this stop

PLN operates this rapid charging site in Kab Bangka Barat, Indonesia. It has one charging point with 100 kW peak power. The connectors available are CCS (Type 2) and a tethered Type 2 connector. The station is currently operational.

This site is suited for drivers needing a quick charge. A 100 kW peak power station can add roughly 50 miles of range to an EV in about 20 minutes, depending on the vehicle. This makes it a practical option for EV charging in Kab Bangka Barat. The cost is IDR2467 per kilowatt-hour plus additional fees.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN ULP Muntok.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN ULP Muntok.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB