PLN ULP Muntok
PLN ULP Muntok, , Jl R.A Kartini, Kab Bangka Barat, ID
3 ports · IDR2467/kWh ++
Ports at this station
- Available
CCS2
2× · up to 100 kW
- Available
Type 2 (tethered)
1× · up to 7 kW
Station info
- Address
- PLN ULP Muntok, , Jl R.A Kartini, Kab Bangka Barat, Kepulauan Bangka Belitung, Indonesia
- Total points
- 1
- Coordinates
- -2.06011, 105.16688
- Last verified
- 2026-04-23
About this stop
PLN operates this rapid charging site in Kab Bangka Barat, Indonesia. It has one charging point with 100 kW peak power. The connectors available are CCS (Type 2) and a tethered Type 2 connector. The station is currently operational.
This site is suited for drivers needing a quick charge. A 100 kW peak power station can add roughly 50 miles of range to an EV in about 20 minutes, depending on the vehicle. This makes it a practical option for EV charging in Kab Bangka Barat. The cost is IDR2467 per kilowatt-hour plus additional fees.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of PLN ULP Muntok.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB