chargevu
1 of 1 operational22 kW peakPLN (Indonesia)

PLN ULP Padalarang

Jl. Raya Purwakarta, Kertamulya, Kec. Padalarang, Bandung, ID

1 port · Rp2467/kWh

Ports at this station

  • Type 2 (tethered)

    1× · up to 22 kW

    Operational

Station info

Address
Jl. Raya Purwakarta, Kertamulya, Kec. Padalarang, 40553, Bandung, Jawa Barat, Indonesia
Total points
1
Coordinates
-6.83880, 107.48753
Last verified
2026-03-17

How this site compares

In Bandung

Faster than 7 of the other 54 sites

23 of 55 sites with a known peak power reach 50 kW or more

PLN (Indonesia)

1,614 sites across 503 cities in Indonesia

All PLN (Indonesia) sites in Indonesia →

50 kW+ within 25 km

26 sites, 6 at 150 kW or more

Nearest: Rest Area KM 125 B Tol Purbaleunyi · 6.4 km · 120 kW · PLN (Indonesia)

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN ULP Padalarang.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN ULP Padalarang.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB