chargevu
2 of 2 available25 kW peakPLN (Indonesia)

PLN ULP Purwakarta Kota

PLN ULP Purwakarta Kota, , Jl Singawinata, Purwakarta, ID

2 ports · IDR 2467/kWh ++

Ports at this station

  • Type 2 (tethered)

    1× · up to 22 kW

    Available
  • CCS2

    1× · up to 25 kW

    Available

Station info

Address
PLN ULP Purwakarta Kota, , Jl Singawinata, 41114, Purwakarta, Jawa Barat, Indonesia
Total points
1
Coordinates
-6.55462, 107.44573
Last verified
2026-07-28

About this stop

This PLN charging station is located in Purwakarta, Indonesia. It is run by the national utility, PLN. One charging point is available, offering both CCS (Type 2) and Type 2 (Tethered Connector) options. The peak power output is 25 kW, which is considered slower AC charging. This facility is one option for EV charging in Purwakarta.

A 25 kW peak power output means you can add about 60-75 miles of range per hour of charging. This speed is best suited for topping up your battery while you are in town or for longer stops. It is not the fastest charging available, but it will get your EV ready for local driving or the next leg of your journey. The cost is IDR 2467 per kWh plus other fees.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN ULP Purwakarta Kota.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN ULP Purwakarta Kota.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB