chargevu
1 of 1 available22 kW peakPLN (Indonesia)

PLN ULP Sengkang

PLN ULP Sengkang, Jl Ahmad Yani, Kabupaten Wajo, ID

1 port

Ports at this station

  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
PLN ULP Sengkang, Jl Ahmad Yani, 90912, Kabupaten Wajo, Sulawesi Selatan, Indonesia
Total points
1
Coordinates
-4.13631, 120.03217
Last verified
2026-07-17

About this stop

PLN operates this AC charging site in Kabupaten Wajo, Indonesia. It offers one charging point with a tethered Type 2 connector and a peak power output of 22 kW. The station is currently reported as operational.

This 22 kW charger is best suited for local top-ups rather than rapid road-trip charging. To put 22 kW in perspective, it will add approximately 12-15 miles of range per hour of charging, depending on your EV's efficiency. This makes it a practical option for topping up your battery while you handle other tasks in the area or for residents needing EV charging in Kabupaten Wajo.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN ULP Sengkang.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN ULP Sengkang.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB