PLN UP3 Kebon Jeruk
PLN UP3 Kebon Jeruk, , Jl. Ciledug Raya No.1, RT.001/RW.002, Cipadu, Kec. Larangan, Tangerang, ID
4 ports · IDR 2467/kWh++
Ports at this station
- Available
Type 2 (tethered)
1× · up to 22 kW
- Available
CCS2
2× · up to 120 kW
- Available
CHAdeMO
1× · up to 60 kW
Station info
- Address
- PLN UP3 Kebon Jeruk, , Jl. Ciledug Raya No.1, RT.001/RW.002, Cipadu, Kec. Larangan, 15155, Tangerang, Banten, Indonesia
- Total points
- 2
- Coordinates
- -6.23429, 106.73826
- Last verified
- 2026-05-30
About this stop
This PLN charging station at UP3 Kebon Jeruk in Tangerang offers CCS (Type 2), CHAdeMO, and tethered Type 2 connectors. These support most EVs sold in Indonesia, from smaller city cars to larger SUVs. The station is operational and run by the PLN network.
With a peak power of 120 kW, this station is a viable option for EV charging in Tangerang, capable of adding about 120 miles of range to an EV in under 30 minutes, depending on the vehicle. It suits drivers needing a quick top-up rather than a full day's charge. The cost is IDR 2467 per kilowatt-hour, plus potential fees.
5 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of PLN UP3 Kebon Jeruk.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB