chargevu
3 of 3 available120 kW peakPLN (Indonesia)

PLN UP3 Pondok Kopi

PLN UP3 Pondok Kopi, , Jl Raden Inten II, Duren Sawit, Jakarta Timur, ID

3 ports · IDR2467/kWh

Ports at this station

  • Type 2 (tethered)

    1× · up to 22 kW

    Available
  • CCS2

    2× · up to 120 kW

    Available

Station info

Address
PLN UP3 Pondok Kopi, , Jl Raden Inten II, Duren Sawit, 13440, Jakarta Timur, DKI Jakarta, Indonesia
Total points
1
Coordinates
-6.24303, 106.92059
Last verified
2026-05-30

About this stop

PLN UP3 Pondok Kopi is an EV charging station in Jakarta Timur, Indonesia. Operated by PLN, it provides 120 kW peak rapid charging with one charging point. The station is equipped with both CCS (Type 2) and a tethered Type 2 connector. It is currently reported as operational.

This station is best suited for a quick power-up rather than a long rest stop. A 120 kW peak rate means a compatible EV could add approximately 100 miles of range in under 30 minutes, depending on the vehicle and battery temperature. It's a practical option for EV charging in Jakarta Timur. The cost is IDR 2467 per kWh.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN UP3 Pondok Kopi.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN UP3 Pondok Kopi.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB