chargevu
1 of 1 available22 kW peakPLN (Indonesia)

PLTU Jeranjang

PLTU Jeranjang, Kebun Ayu, Kec Gerung, Lombok Barat, ID

1 port

Ports at this station

  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
PLTU Jeranjang, Kebun Ayu, Kec Gerung, 83363, Lombok Barat, Nusa Tenggara Barat, Indonesia
Total points
1
Coordinates
-8.65899, 116.07499
Last verified
2026-03-11

About this stop

For drivers needing a slower AC charge, the PLTU Jeranjang station in Lombok Barat offers a single charging point. Operated by PLN, it delivers up to 22 kW peak power through a tethered Type 2 connector. This is one of the EV charging options in Lombok Barat.

Expect about 50 miles of range added per hour of charging at 22 kW peak. This speed makes it best for local top-ups or longer stops rather than quick road-trip boosts. The station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLTU Jeranjang.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLTU Jeranjang.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB