Rest. Can Ferreroles Nou
Rest. Can Ferreroles Nou, Castellbell i el Vilar, ES
4 ports · 0,50€/kWh 100kW - 0,39€/kWh 50 kW - 0,32€/kWh AC
Ports at this station
- Available
CCS2
2× · up to 100 kW
- Available
CHAdeMO
1× · up to 50 kW
- Available
Type 2
1× · up to 22 kW
Station info
- Address
- Rest. Can Ferreroles Nou, 08296, Castellbell i el Vilar, Catalonia, Spain
- Total points
- 2
- Coordinates
- 41.64837, 1.82731
- Last verified
- 2025-04-12
About this stop
TotalEnergies operates two rapid chargers at Rest. Can Ferreroles Nou in Castellbell I El Vilar. The station offers 100 kW peak power. Connectors include CCS (Type 2), CHAdeMO, and Type 2 sockets. The reported status is operational.
This site is a solid choice for EV charging in Castellbell I El Vilar. A 100 kW peak rate can add about 100 miles of range in 20 to 30 minutes, depending on your car and battery level. Rates vary by speed: 0,50€/kWh for 100 kW, 0,39€/kWh for 50 kW, and 0,32€/kWh for AC charging. This charging speed makes it practical for quick top-ups on longer journeys or for local drivers needing a fast charge.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Rest. Can Ferreroles Nou.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB