chargevu
4 of 4 available100 kW peakTotalEnergies (ES)

Rest. El Valle Grande

Carretera de Cáceres a Badajoz, Puebla de Obando, ES

4 ports · 0,50€/kWh >60kW - 0,39€/kWh 50kW - 0,32€/kWh AC

Ports at this station

  • CCS2

    2× · up to 100 kW

    Available
  • CHAdeMO

    1× · up to 50 kW

    Available
  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
Carretera de Cáceres a Badajoz, Puebla de Obando, Extremadura, Spain
Total points
2
Coordinates
39.17621, -6.62068
Last verified
2025-04-30

About this stop

This TotalEnergies station offers EV charging in Puebla De Obando with two points. It supports CCS (Type 2), CHAdeMO, and Type 2 (Socket Only) connectors, catering to a range of electric vehicles. The rapid charger can reach a peak of 100 kW.

A 100 kW peak means you could add around 100 miles of range in about 20 to 30 minutes for many EVs, depending on the vehicle's battery size and charging rate. This makes it a practical stop for covering longer distances, not just a local top-up. The cost is 0,50€ per kWh for charging above 60 kW, 0,39€ per kWh at 50 kW, and 0,32€ per kWh for AC charging.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Rest. El Valle Grande.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Rest. El Valle Grande.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB