chargevu
2 of 2 available22 kW peakEE-Mobil

Rolf Fischer GmbH

Landstraße 18, Bargstedt, DE

2 ports

Ports at this station

  • Type 2

    1× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    1× · up to 3.7 kW

    Available

Station info

Address
Landstraße 18, 21698, Bargstedt, Samtgemeinde Harsefeld, Germany
Coordinates
53.46113, 9.46127
Last verified
2017-04-10

About this stop

EE-Mobil operates this charging site in Bargstedt, Germany. It provides AC charging up to 22 kW. Connectors available are CEE 7/4 Schuko and Type 2 sockets. The station is currently operational.

This is a slower AC charging option, best for local top-ups or longer stops. A 22 kW peak output means roughly adding 70-100 miles of range to a compatible EV over two hours, depending on the vehicle. This makes it a practical choice for EV charging in Bargstedt when you have time to spare, rather than a quick charge on a long journey.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Rolf Fischer GmbH.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Rolf Fischer GmbH.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB