chargevu
Status not reported3.7 kW peakIndependent

Sheridan College Hazel McCallion Campus

4180 Duke of York Blvd, Mississauga, CA

8 ports

Ports at this station

  • Type 1 (J1772)

    8× · up to 3.7 kW

    Not reported

Station info

Address
4180 Duke of York Blvd, L5B 3W3, Mississauga, ON, Canada
Access
Available during parking lot hours
Coordinates
43.59321, -79.64259
Last verified
2025-11-11

How this site compares

In Mississauga

Faster than 17 of the other 299 sites

45 of 300 sites with a known peak power reach 50 kW or more

50 kW+ within 25 km

174 sites, 31 at 150 kW or more

Nearest: RioCan Grand Park · 1.5 km · 50 kW · flo

About this stop

Planned for future date. Not Operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Sheridan College Hazel McCallion Campus.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Sheridan College Hazel McCallion Campus.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB

Sheridan College Hazel McCallion Campus EV Charging · Chargevu