chargevu
0 of 2 available3.7 kW peakLoop

Southport Business Park Building 6

140 Southcenter Ct, Morrisville, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
140 Southcenter Ct, 27560, Morrisville, NC, United States
Access
24 hours daily Public - Credit card at all times
Coordinates
35.84008, -78.81433
Last verified
2025-11-11

About this stop

Loop operates this EV charging station at Southport Business Park Building 6 in Morrisville. The site offers Type 1 (J1772) connectors. Its reported status is operational. Peak power here is 4 kW, a slower AC charging speed.

This station is best suited for local top-ups rather than long-distance road trips. A 4 kW charging rate typically adds about 12 to 16 miles of range per hour, depending on your vehicle. For context, a full charge might take several hours. This is one option for EV charging in Morrisville if you are in the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Southport Business Park Building 6.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Southport Business Park Building 6.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB