chargevu
4 of 4 available180 kW peakPLN (Indonesia)

SPBU BP AKR PIK 2

SPBU BP AKR PIK 2, , Jl M. Husni Thamrin, Tangerang, ID

4 ports · IDR 2467/kWh ++

Ports at this station

  • CCS2

    4× · up to 180 kW

    Available

Station info

Address
SPBU BP AKR PIK 2, , Jl M. Husni Thamrin, 15214, Tangerang, Banten, Indonesia
Total points
1
Coordinates
-6.06438, 106.69034
Last verified
2026-07-26

About this stop

PLN operates this ultra-rapid EV charging station at SPBU BP AKR PIK 2 in Tangerang, Indonesia. It has one charging point with a CCS (Type 2) connector capable of 180 kW peak output. The station is currently reported as operational. The cost is IDR 2467 per kilowatt-hour plus additional fees.

This station is a strong option for EV charging in Tangerang. Its 180 kW peak power means it can add roughly 100 miles of range to a compatible EV in about 20 minutes. This makes it suitable for quick top-ups or longer journeys. The unit is positioned for drivers needing fast charging.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at SPBU BP AKR PIK 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of SPBU BP AKR PIK 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB