SPBU BP AKR PIK 2
SPBU BP AKR PIK 2, , Jl M. Husni Thamrin, Tangerang, ID
4 ports · IDR 2467/kWh ++
Ports at this station
- Available
CCS2
4× · up to 180 kW
Station info
- Address
- SPBU BP AKR PIK 2, , Jl M. Husni Thamrin, 15214, Tangerang, Banten, Indonesia
- Total points
- 1
- Coordinates
- -6.06438, 106.69034
- Last verified
- 2026-07-26
About this stop
PLN operates this ultra-rapid EV charging station at SPBU BP AKR PIK 2 in Tangerang, Indonesia. It has one charging point with a CCS (Type 2) connector capable of 180 kW peak output. The station is currently reported as operational. The cost is IDR 2467 per kilowatt-hour plus additional fees.
This station is a strong option for EV charging in Tangerang. Its 180 kW peak power means it can add roughly 100 miles of range to a compatible EV in about 20 minutes. This makes it suitable for quick top-ups or longer journeys. The unit is positioned for drivers needing fast charging.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of SPBU BP AKR PIK 2.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB