chargevu
5 of 5 available120 kW peakPLN (Indonesia)

SPKLU Munggu

SPKLU Munggu, , Jl. Raya Munggu Jl. By Pass Tanah Lot No.12, Munggu, Kec. Mengwi, , Kabupaten Badung, ID

5 ports · Rp.2467/kWh

Ports at this station

  • CCS2

    4× · up to 120 kW

    Available
  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
SPKLU Munggu, , Jl. Raya Munggu Jl. By Pass Tanah Lot No.12, Munggu, Kec. Mengwi, , 80351, Kabupaten Badung, Bali , Indonesia
Total points
1
Coordinates
-8.62432, 115.12352
Last verified
2026-07-04

About this stop

SPKLU Munggu is a public EV charger located in Kabupaten Badung, Indonesia. The station is operated by PLN and provides 120 kW peak charging power. It offers one charging point equipped with both CCS (Type 2) and a tethered Type 2 connector. This facility is operational and available for EV drivers needing to charge their vehicles.

This station is a good option for EV charging in Kabupaten Badung. A 120 kW peak charging rate can add approximately 150 miles of range to a compatible EV in 20 minutes, making it suitable for quick top-ups or mid-journey boosts. Drivers can expect to pay Rp.2467 per kilowatt-hour for electricity at this location. The charging point is currently reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at SPKLU Munggu.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of SPKLU Munggu.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB