SWD Factory Campus E-Bike-Ladestation
Erkrather Straße 401, Düsseldorf, DE
4 ports
Ports at this station
- Available
Schuko (CEE 7/4)
4× · up to 3.7 kW
Station info
- Address
- Erkrather Straße 401, 40231, Düsseldorf, Nordrhein Westfalen, Germany
- Access
- E-Bike-LadestationÖffnungszeiten:Mo - Fr jeweils 8-20 UhrZufahrt über Werkstor gegenüber Gatherweg 69
- Total points
- 4
- Phone
- 0211-8218210
- Website
- swd-ag.de
- Coordinates
- 51.20961, 6.82735
- Last verified
- 2017-02-28
About this stop
Stadtwerke Düsseldorf AG operates the SWD Factory Campus E-Bike-Ladestation in Düsseldorf. This site has four charging points that deliver up to 4 kW of power each. The station uses CEE 7/4, also known as Schuko, connectors. This is a slower AC charging option.
At 4 kW, a typical EV might add about 10-15 miles of range per hour of charging. This station is best suited for local top-ups rather than quick road-trip stops. If you need EV charging in Düsseldorf and have the time for a slower charge, this location is an option. The charging service is currently free to use.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of SWD Factory Campus E-Bike-Ladestation.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB