chargevu
4 of 4 available3.7 kW peakStadtwerke Düsseldorf AG

SWD Factory Campus E-Bike-Ladestation

Erkrather Straße 401, Düsseldorf, DE

4 ports

Ports at this station

  • Schuko (CEE 7/4)

    4× · up to 3.7 kW

    Available

Station info

Address
Erkrather Straße 401, 40231, Düsseldorf, Nordrhein Westfalen, Germany
Access
E-Bike-LadestationÖffnungszeiten:Mo - Fr jeweils 8-20 UhrZufahrt über Werkstor gegenüber Gatherweg 69
Total points
4
Website
swd-ag.de
Coordinates
51.20961, 6.82735
Last verified
2017-02-28

About this stop

Stadtwerke Düsseldorf AG operates the SWD Factory Campus E-Bike-Ladestation in Düsseldorf. This site has four charging points that deliver up to 4 kW of power each. The station uses CEE 7/4, also known as Schuko, connectors. This is a slower AC charging option.

At 4 kW, a typical EV might add about 10-15 miles of range per hour of charging. This station is best suited for local top-ups rather than quick road-trip stops. If you need EV charging in Düsseldorf and have the time for a slower charge, this location is an option. The charging service is currently free to use.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at SWD Factory Campus E-Bike-Ladestation.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of SWD Factory Campus E-Bike-Ladestation.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB