chargevu
4 of 4 available22 kW peakStadtwerke Düsseldorf AG

SWD Flughafen Düsseldorf, Parkhaus 5

Kieshecker Weg 250, Stockum, Düsseldorf, DE

4 ports

Ports at this station

  • Type 2

    2× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    2× · up to 3.7 kW

    Available

Station info

Address
Kieshecker Weg 250, Stockum, 40474, Düsseldorf, Germany
Total points
4
Coordinates
51.28143, 6.77519
Last verified
2016-01-12

About this stop

Stadtwerke Düsseldorf AG operates four AC charging points at Düsseldorf Airport's Parkhaus 5. These stations deliver a peak power of 22 kW. Drivers can connect using either a Type 2 (socket only) or a CEE 7/4 Schuko connector. The station is currently operational.

This is a slower AC charging option, best suited for topping up while at the airport. A 22 kW peak output means you might add about 60 to 70 miles of range per hour of charging, depending on your EV. It's a practical stop for EV charging in Düsseldorf if you are already parked at the airport. There is no charge to use the station.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at SWD Flughafen Düsseldorf, Parkhaus 5.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of SWD Flughafen Düsseldorf, Parkhaus 5.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB