chargevu
4 of 4 available22 kW peakStadtwerke Düsseldorf AG

SWD Henkel Parkplatz Tor 1

Henkelstraße 67, Holthausen, Düsseldorf, DE

4 ports

Ports at this station

  • Type 2

    2× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    2× · up to 3.7 kW

    Available

Station info

Address
Henkelstraße 67, Holthausen, 40589, Düsseldorf, Germany
Access
Direkt am Tor 1 der Henkel AG und auf dem Werksgelände. Sollte der Parkplatz abgeschrankt sein, bitte beim Pförtner melden.
Total points
2
Coordinates
51.17541, 6.83777
Last verified
2016-01-12

About this stop

This Stadtwerke Düsseldorf AG station at SWD Henkel Parkplatz Tor 1 in Düsseldorf provides 22 kW AC charging, suitable for drivers needing a moderate top-up. It has two charging points, offering CEE 7/4 (Schuko) and Type 2 (Socket Only) connectors. This facility is operational and free to use. EV charging in Düsseldorf can be this straightforward.

A 22 kW charging speed means you can add about 40-50 miles of range per hour, depending on your vehicle. This makes it a good option for local charging or a longer stop rather than a quick road-trip boost. Plan accordingly if you are looking to significantly replenish your battery. It is a practical stop for drivers in the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at SWD Henkel Parkplatz Tor 1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of SWD Henkel Parkplatz Tor 1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB