Tesco Head Office-Highwoods Building
Shire Park, The Boulevard, GB
4 ports · Free
Ports at this station
- Unknown
Type 2
4× · up to 7 kW
Station info
- Address
- Shire Park, AL7 1GB, The Boulevard, Hertfordshire, United Kingdom
- Total points
- 4
- Coordinates
- 51.80785, -0.19769
- Last verified
- 2023-10-09
About this stop
The Tesco Head Office-Highwoods Building charging station is located on The Boulevard in GB. POD Point operates this site, which offers four charging points. Each point has a Type 2 connector and provides up to 7 kW of peak AC power. The reported status for these chargers is unknown. EV charging in The Boulevard is available here for free.
At 7 kW peak, this station is best suited for local top-ups rather than long-distance road trips. A 7 kW charger typically adds about 25 to 30 miles of range per hour of charging. This means a full charge for many smaller EVs could take several hours. Drivers should plan accordingly for parking and charging duration at this location.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Tesco Head Office-Highwoods Building.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB