chargevu
0 of 4 available7 kW peakPOD Point (UK)

Tesco Head Office-Highwoods Building

Shire Park, The Boulevard, GB

4 ports · Free

Ports at this station

  • Type 2

    4× · up to 7 kW

    Unknown

Station info

Address
Shire Park, AL7 1GB, The Boulevard, Hertfordshire, United Kingdom
Total points
4
Coordinates
51.80785, -0.19769
Last verified
2023-10-09

About this stop

The Tesco Head Office-Highwoods Building charging station is located on The Boulevard in GB. POD Point operates this site, which offers four charging points. Each point has a Type 2 connector and provides up to 7 kW of peak AC power. The reported status for these chargers is unknown. EV charging in The Boulevard is available here for free.

At 7 kW peak, this station is best suited for local top-ups rather than long-distance road trips. A 7 kW charger typically adds about 25 to 30 miles of range per hour of charging. This means a full charge for many smaller EVs could take several hours. Drivers should plan accordingly for parking and charging duration at this location.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Tesco Head Office-Highwoods Building.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Tesco Head Office-Highwoods Building.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB