chargevu
2 of 2 available22 kW peakStadtwerke Düsseldorf AG

Torfbruchstr. 25

Torfbruchstr. 25, Düsseldorf, DE

2 ports

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available

Station info

Address
Torfbruchstr. 25, 40625, Düsseldorf, Germany
Coordinates
51.23569, 6.84053
Last verified
2021-07-09

About this stop

In Düsseldorf, Germany, you can find an EV charging station at Torfbruchstr. 25, operated by Stadtwerke Düsseldorf AG. This location offers charging points equipped with CEE 7/4 (Schuko) Type F connectors. The station provides AC charging with a peak power output of 22 kW.

With a 22 kW peak, this charger is best suited for local top-ups or longer stays rather than rapid road-trip refueling. To put 22 kW into perspective, a car with a 60 kWh battery could gain approximately 100 miles of range in 4 hours of charging. This charging point is currently operational and ready for use, contributing to EV charging in Düsseldorf.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Torfbruchstr. 25.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Torfbruchstr. 25.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB