chargevu
0 of 2 available3.7 kW peakChargePoint

TOWER COMPANIES 1909K STATION 1

1909 K St NWUS-29, Washington, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
1909 K St NWUS-29, 20006, Washington, DC, United States
Access
24 hours daily
Coordinates
38.90300, -77.04417
Last verified
2025-06-24

About this stop

This ChargePoint station at TOWER COMPANIES 1909K STATION 1 in Washington uses Type 1 (J1772) connectors, compatible with most electric vehicles sold in North America. The station is currently reported as Temporarily Unavailable.

A peak power of 4 kW means this is a slower AC charging option. Expect to add about 12 to 18 miles of range per hour of charging. This rate is best suited for local top-ups or longer stops rather than quick road-trip charging. EV charging in Washington includes options like this one, but drivers should check real-time availability.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at TOWER COMPANIES 1909K STATION 1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of TOWER COMPANIES 1909K STATION 1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB