chargevu
0 of 2 available3.7 kW peakChargePoint

TOWN OF MAYNARD PARKING

2-18 Summer St, Maynard, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
2-18 Summer St, 01754, Maynard, MA, United States
Access
24 hours daily
Coordinates
42.43317, -71.45202
Last verified
2025-11-11

About this stop

This ChargePoint station at TOWN OF MAYNARD PARKING is for EV owners needing a slower AC charge. It offers Type 1 (J1772) connectors. This is an operational site in Maynard, US. EV charging in Maynard is available here.

A 4 kW peak charging speed means it is best suited for topping up your battery while parked locally, not for rapid road trip refueling. For perspective, adding about 15-20 miles of range per hour is typical for a 4 kW charger. This station is a practical choice for residents or visitors looking for a charge during their stay in town.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at TOWN OF MAYNARD PARKING.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of TOWN OF MAYNARD PARKING.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB