chargevu
2 of 2 available95 kW peakAlperia (IT)

Zona Artigianale Est

Zona Artigianale Est 24, Casateia, IT

2 ports

Ports at this station

  • CCS2

    2× · up to 95 kW

    Available

Station info

Address
Zona Artigianale Est 24, Casateia, BZ, Italy
Total points
2
Coordinates
46.88414, 11.41173
Last verified
2025-02-16

About this stop

Zona Artigianale Est in Casateia, Italy, offers EV charging through the Neogy network. The station provides 95 kW peak rapid charging via two charging points equipped with CCS (Type 2) connectors. It is currently reported as operational.

This station is best suited for quick top-ups rather than long road trips. A 95 kW peak power output can add about 150 miles of range to a compatible EV in roughly 30 minutes, depending on the vehicle and battery temperature. EV charging in Casateia includes this Neogy option for drivers needing power.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Zona Artigianale Est.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Zona Artigianale Est.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB