chargevu
0 of 2 available3.7 kW peakChargePoint

3 EXECUTIVE NORTHWEST EVCS

3 Executive Campus, Cherry Hill, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
3 Executive Campus, 08002, Cherry Hill, NJ, United States
Access
24 hours daily
Coordinates
39.93183, -75.05099
Last verified
2025-11-11

About this stop

This ChargePoint station at 3 EXECUTIVE NORTHWEST EVCS in Cherry Hill offers Type 1 (J1772) connectors. These fit most electric vehicles sold in North America, including many older Nissan Leafs and Chevrolet Volts. The station provides AC charging with a peak output of 4 kW.

A 4 kW peak means you will add about 12 to 16 miles of range per hour of charging. This rate is best suited for topping up your battery while parked for a few hours, like at work or running errands, rather than a quick stop on a long road trip. It is one option for EV charging in Cherry Hill if you need a slower, more predictable charge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at 3 EXECUTIVE NORTHWEST EVCS.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of 3 EXECUTIVE NORTHWEST EVCS.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB