chargevu
0 of 2 available50 kW peakBlink Charging

DoubleTree by Hilton - Cherry Hill

2349 Marlton Pike West, Cherry Hill, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
2349 Marlton Pike West, 8002, Cherry Hill, NJ, United States
Access
24 hours daily
Coordinates
39.92636, -75.05352
Last verified
2025-11-11

About this stop

Blink Charging operates this EV charging site at the DoubleTree by Hilton in Cherry Hill. The station provides CCS (Type 1) and CHAdeMO connectors. It can deliver up to 50 kW of peak power, classified as rapid charging.

This 50 kW peak power means you can add about 20 miles of range per 10 minutes of charging, depending on your vehicle. It is suitable for a quick top-up while visiting the hotel or a necessary stop for EV charging in Cherry Hill. Plan for longer charging sessions if your battery is nearly full or if your car cannot accept the full 50 kW rate.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at DoubleTree by Hilton - Cherry Hill.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of DoubleTree by Hilton - Cherry Hill.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB

Blink Charging at DoubleTree Cherry Hill · Chargevu