Department of Energy - Clark Development Corporation
Department of Energy - Clark Development Corporation, East Jacinto Street, Clark, PH
2 ports
Ports at this station
- Available
CCS2
1× · up to 80 kW
- Available
GB/T DC
1× · up to 80 kW
Station info
- Address
- Department of Energy - Clark Development Corporation, East Jacinto Street, 2023, Clark, Pampanga, Philippines
- Total points
- 2
- Coordinates
- 15.18311, 120.52672
- Last verified
- 2026-02-09
About this stop
This 80 kW rapid charger suits EVs needing a substantial charge. Located in Clark, PH, the Department of Energy - Clark Development Corporation station is part of the ParkNCharge network. It offers two charging points equipped with CCS (Type 2) and GB-T DC connectors, supporting common EV standards. The station is currently operational.
EV charging in Clark is evolving. An 80 kW peak power output means a compatible EV could gain roughly 150 miles of range in an hour, depending on vehicle efficiency and battery state. This makes it a good option for a rapid top-up rather than a destination charger. The station has two points, but no information is available on whether charging speeds are shared between them.
5 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Department of Energy - Clark Development Corporation.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB