chargevu
1 of 1 available22 kW peakPLN (Indonesia)

Gedung Budaya Sabilulungan

Gedung Budaya Sabilulungan, , Jl. Al-Fathu No.104, Kabupaten Bandung, ID

1 port · IDR 2466/kWh

Ports at this station

  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
Gedung Budaya Sabilulungan, , Jl. Al-Fathu No.104, 40912, Kabupaten Bandung, Jawa Barat, Indonesia
Total points
1
Coordinates
-7.02060, 107.53031
Last verified
2026-05-22

About this stop

This single-point AC charger at Gedung Budaya Sabilulungan in Kabupaten Bandung is operated by PLN. It offers a peak power of 22 kW and uses a tethered Type 2 connector. This speed is best suited for drivers needing a steady charge rather than a rapid refill.

If you're looking for EV charging in Kabupaten Bandung, this station functions as a slower AC top-up point, ideal for local use or a break. A 22 kW peak AC charger typically adds around 15 to 20 miles of range per hour, depending on the vehicle's efficiency and battery state. This means a full charge could take several hours, making it less efficient for long-distance road trips where faster charging is preferred.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Gedung Budaya Sabilulungan.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Gedung Budaya Sabilulungan.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB