chargevu
3 of 3 available40 kW peakPLN (Indonesia)

PLN ULP Bondowoso

PLN ULP Bondowoso, , Jl. Kolonel Sugiono, Kademangan Kulon, Kademangan, Kec. Bondowoso, Kabupaten Bondowoso, ID

3 ports · IDR 2467/kWh

Ports at this station

  • CCS2

    1× · up to 40 kW

    Available
  • CHAdeMO

    1× · up to 40 kW

    Available
  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
PLN ULP Bondowoso, , Jl. Kolonel Sugiono, Kademangan Kulon, Kademangan, Kec. Bondowoso, 68217, Kabupaten Bondowoso, Jawa Timur, Indonesia
Total points
1
Coordinates
-7.91772, 113.82972
Last verified
2026-03-08

About this stop

PLN ULP Bondowoso provides 40 kW peak AC charging, suitable for drivers needing a slower charge in Kabupaten Bondowoso. The single charging point supports CCS (Type 2), CHAdeMO, and a tethered Type 2 connector. EV charging in Kabupaten Bondowoso is served by this PLN-operated site.

At 40 kW peak, this is best suited for local top-ups or longer stops rather than rapid road trip charging. For perspective, adding 100 miles of range to a car that gets 3 miles per kWh would take about 33.3 kWh of energy. At 40 kW, that would take roughly 50 minutes. The cost is IDR 2467 per kWh. The station is reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN ULP Bondowoso.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN ULP Bondowoso.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB