chargevu
3 of 3 available50 kW peakPLN (Indonesia)

Rest Area Utama Raya Situbondo

Rest Area Utama Raya Situbondo, , Krajan, Banyuglugur, Situbondo, ID

3 ports · Rp.2467/kWh

Ports at this station

  • CCS2

    1× · up to 50 kW

    Available
  • CHAdeMO

    1× · up to 50 kW

    Available
  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
Rest Area Utama Raya Situbondo, , Krajan, Banyuglugur, 68359, Situbondo, Jawa Timur, Indonesia
Total points
1
Coordinates
-7.72407, 113.62031
Last verified
2026-05-24

About this stop

PLN operates this charging site at Rest Area Utama Raya Situbondo. It provides 50 kW peak rapid charging via a single point. Connectors available are CCS (Type 2), CHAdeMO, and a tethered Type 2 connector. The station is currently operational. EV charging in Situbondo is available here. The cost is Rp.2467 per kWh.

This is a rapid charging stop. 50 kW peak power can add about 150 miles of range to a typical EV in roughly 30 minutes. It is best suited for road trips or when you need a quick battery top-up rather than an overnight charge. Its location makes it a convenient point for drivers needing power along their route.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Rest Area Utama Raya Situbondo.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Rest Area Utama Raya Situbondo.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB