≥ 150 kW0 stations
Ultra-rapid charging in Beringen
Sites in Beringen with at least one 150 kW socket — the fastest stops in town.
No ultra-rapid indexed in Beringen yet. See all charging in Beringen.
Sites in Beringen with at least one 150 kW socket — the fastest stops in town.