BP Pulse (UK)
Headquarters - 路 operates in GB
BP Pulse lists 2,190 public charging points in GB, France, Guernsey, Jersey and Luxembourg. 1,468 are AC below 50 kW, 722 are rapid or faster.
How BP Pulse (UK) fits in
- Peak DC power
- 400 kW
- Supported connectors
- Headquarters
- -
- Operating regions
- GB
Locate a BP Pulse (UK) station
Filter the map by operator to see only BP Pulse (UK) sites in your country. Coverage data refreshes nightly from the source feeds.
Open the mapBP Pulse coverage overview: 2,190 points, mostly AC charging
BP Pulse has 2,190 public charging points in our database, spread across Great Britain, France, Guernsey, Jersey and Luxembourg. Two thirds of those points are AC below 50 kW, which tells you what the network is built for: parking, working and sleeping, not racing up a motorway. Here is the breakdown, the connectors you will meet, and what to check before you plug in.
Where the points are
BP Pulse lists 2,190 public charging points in our database, across Great Britain, France, Guernsey, Jersey and Luxembourg. The UK carries most of the visible weight. London has 255 points, Milton Keynes 107, Luton 27, Bristol 26 and Nottingham 23. Those five towns account for 438 points, which leaves 1,752 elsewhere in the five jurisdictions.
The power mix
Split the 2,190 by speed and the shape is obvious. 1,468 points are AC below 50 kW, typically Type 2 at 7 to 22 kW. That is 67% of the network, and it is destination charging: car parks, workplaces, kerbside and overnight top-ups where the car sits for an hour or more. Another 592 points are rapid, 50 to 149 kW. 130 are ultra-rapid at 150 kW or above. The 722 points at 50 kW and up make up the other third.
Connectors you will meet
The sites list four connector types. Type 2 socket only, Type 2 tethered, CCS and CHAdeMO. Socket only means you bring the cable. Tethered Type 2 means you do not. CCS covers most current EVs and sits on the rapid and ultra-rapid stalls. CHAdeMO is there for older cars that still use it.
Reading the mix as a driver
The headline number, 2,190, is not the number you can use on a journey. On a long drive only the 722 rapid and ultra-rapid points count, and 130 of those are the genuinely quick ones. For everything else, plan around parking: a hotel, a workplace, a supermarket trip. Look up the specific site before you set off, because a town with a dozen AC points may have no rapid stall at all. Our database shows power per point, so check the stall, not the town.
Before you plug in
Most operators take a contactless bank card or their own app. Have one of the two ready before you arrive. Check the price shown in the app or on the unit before you plug in, because a 7 kW kerbside stall and a 150 kW unit are priced differently. If a stall is dead, try another on the same site, then contact the operator with the stall number. A slow AC point is fine when you are staying put. It is a waste of an afternoon when you are not.
- Where does BP Pulse have charging points?
- Our database lists 2,190 BP Pulse public charging points across Great Britain, France, Guernsey, Jersey and Luxembourg. Within the UK the busiest towns are London with 255 points, Milton Keynes with 107, Luton with 27, Bristol with 26 and Nottingham with 23. Those five account for 438 points, and the remaining 1,752 sit across the rest of the five jurisdictions. For a specific trip, check the location on the map before you assume your town is covered.
- How fast are BP Pulse chargers?
- Most of them are slow. 1,468 of the 2,190 points are AC below 50 kW, typically 7 to 22 kW, which suits a car parked for an hour or overnight. 592 points are rapid at 50 to 149 kW and 130 are ultra-rapid at 150 kW or above. So about a third of the network can add meaningful range in a short stop, and two thirds cannot. Check the power rating on the specific stall before planning around it.
- Which connectors will I find on BP Pulse sites?
- Type 2 socket only, Type 2 tethered, CCS and CHAdeMO. The AC majority is Type 2, either tethered or socket only, so if your car has a Type 2 inlet you may need your own cable at socket only stalls. CCS is what most current EVs use on the rapid and ultra-rapid points. CHAdeMO shows up for older models. Our database records connector type per site.
- Can I use this network for a long motorway drive?
- Only partly. Just 722 of the 2,190 points are 50 kW or faster, and 130 are 150 kW or above. That is a thin set to build a route on next to the 1,468 AC points. If your journey depends on fast charging, plan stops against the rapid and ultra-rapid stalls specifically, and keep a second option in mind for each one. The AC points are useful at a destination, not mid-route.
- Do I need to bring my own charging cable?
- Sometimes. The sites list Type 2 socket only as well as Type 2 tethered connectors. Socket only means the stall has no cable attached and you supply one. Tethered means the cable is fixed to the unit. If you drive a Type 2 car and want to use the AC points, keeping the cable in the boot removes the guesswork. CCS and CHAdeMO stalls are tethered by design.
- How do I pay, and what does it cost?
- We hold no tariff data for BP Pulse, so treat any price as site specific. In general, most operators take a contactless bank card or their own app, and having one of the two ready before you arrive saves time. Check the price shown in the app or on the unit before you plug in. Rates often differ between a 7 kW AC point and a 150 kW unit, so compare before you commit.