eVgo Network
Headquarters - 路 operates in US
eVgo Network has 2,196 public charging points in the US and Romania: 942 rapid, 750 at 150 kW or more, 504 AC. Connectors and what to expect.
How eVgo Network fits in
- Peak DC power
- 400 kW
- Supported connectors
- Headquarters
- -
- Operating regions
- US
Locate a eVgo Network station
Filter the map by operator to see only eVgo Network sites in your country. Coverage data refreshes nightly from the source feeds.
Open the mapeVgo Network coverage: 2,196 points, mostly in the rapid band
eVgo Network lists 2,196 public charging points in our database, split between the United States and Romania. Most are DC: 942 points sit in the 50 to 149 kW band and 750 reach 150 kW or higher. The remaining 504 are slower AC points under 50 kW. The busiest town we see is San Diego with 34 points, followed by San Francisco, Houston, San Jose and Atlanta.
How large the network is, and where it sits
Our database lists 2,196 public charging points under the eVgo Network name, across the United States and Romania. The US towns with the most points are San Diego (34), San Francisco (23), Houston (22), San Jose (20) and Atlanta (18). Those five come to 117 points, about 5 percent of the total, so no single metro carries the network. Outside those areas, open the map before you set off instead of assuming a stall is around the corner.
What the power mix means at the plug
The split matters more than the headline count.
- 942 points at 50 to 149 kW. This is the bulk of the network and what most drivers will plug into. A 20 to 40 minute stop is realistic here.
- 750 points at 150 kW and above. That is about a third of the network, not all of it. Do not assume the fastest tier at every site you roll up to.
- 504 points under 50 kW. AC, slow. Workable for a long shopping trip or an overnight stay, painful mid-route.
DC points, rapid plus ultra-rapid, total 1,692. That is about 77 percent of the network, so the layout leans toward en-route top-ups rather than destination parking.
Connectors you will meet
Four types appear on their sites: CCS (Type 1), CHAdeMO, Type 1 (J1772) and NACS. A CCS car covers the DC points. A Leaf or another CHAdeMO car needs that specific cable. J1772 covers the slower AC points. Check the cable on the stall you pulled into before you plug in, because it is not one universal plug.
Practical notes
Most operators take contactless payment or their own app. Check the price shown in the app or on the unit before you plug in, since pricing models differ between sites and networks. If a stall is dead, try the next one along and report it to the operator.
- Where does eVgo Network have chargers?
- Two countries show up in our data: the United States and Romania. The busiest US towns are San Diego with 34 points, San Francisco with 23, Houston with 22, San Jose with 20 and Atlanta with 18. Everything else is thinner. If your route runs outside those metros, check the map before you leave rather than counting on a stall being there when you arrive.
- How fast are the chargers?
- Of 2,196 public points, 750 are rated 150 kW or above, 942 sit in the 50 to 149 kW rapid band and 504 are AC under 50 kW. The rapid band is the largest single group, so plan around a 20 to 40 minute stop at most sites. Ultra-rapid is a third of the network, so do not assume it at every location you pull into.
- Which connectors will I find?
- The connector list covers CCS (Type 1), CHAdeMO, Type 1 (J1772) and NACS. CCS is what most modern US EVs use on the DC points. CHAdeMO matters if you drive a Leaf or similar. J1772 covers the slower AC points. NACS appears too. Cables are not universal across stalls, so look at the plug on the unit before you park and start a session.
- Can I just tap a bank card, or do I need an app?
- We have no verified detail on payment methods for this network, so check before you rely on one route. As a rule, most operators accept a contactless bank card or their own app. Confirm the price on the unit or in the app before you plug in, since pricing models vary between sites and you do not want a surprise per-minute charge on a slow session.
- What should I do if a stall is broken or occupied?
- Try the next stall along first. Multi-stall sites are common enough that one dead unit does not usually end the stop. If every stall at the location fails, contact the operator and move to another charging location on the map. Report the fault either way, since it is the only way it gets fixed for the next driver.
- Can I count on 150 kW or faster everywhere?
- No. Only 750 of the 2,196 points reach 150 kW or above. The 942 points in the 50 to 149 kW band are the largest group and the 504 AC points sit below 50 kW. Check the power rating on the specific stall in the app or on the unit before you plan a tight charging stop around a fast charge.