≥ 150 kW0 stations
Ultra-rapid charging in 68/a
Sites in 68/a with at least one 150 kW socket — the fastest stops in town.
No ultra-rapid indexed in 68/a yet. See all charging in 68/a.
Sites in 68/a with at least one 150 kW socket — the fastest stops in town.