EV charging in Lérida
Spain
Lérida has 10 public EV charging stations: 6 fast (50 kW and up), 2 of them ultra-rapid (150 kW and up). The largest networks are ACCIONA - Cargacoches (1), ALDI SÜD (DE) (1), Eranovum (ES) (1).
Data: Open Charge Map contributors and Chargevu drivers · checked · last listing change
Tap any marker for power, status and directions. The view updates as you move.
Station missing? Add itBrowse by country →Pan or zoom the map to load every charger in view.
10
Stations
6
Fast (≥50 kW)
2
Ultra (≥150 kW)
9
Operators
Fast chargers in Lérida
6 stations doing at least 50 kW on DC.
≥ 150 kWUltra-rapid in Lérida
2 sites at 150 kW or higher.
no feeFree charging in Lérida
Stations that list zero cost. Confirm at the station, prices move.
citiesOther cities in Spain
Every town in Spain with a charger, by station count.
countryAll charging in Spain
Back to the country overview with every city, network, and connector.
Plug in around Lérida
10 sites, sorted by peak power. Page 1 of 1.
ElectroTruck Torre-Serona Lérida
600 kWeTecnic · 0,29€/kWh
Fiat Lérida CarU 02
150 kWIberdrola | BP Pulse (ES) · 0,54 €/kWh
Rest. Caballeira
100 kWACCIONA - Cargacoches · 0,54€/kWh
Consum Lérida
100 kWEranovum (ES) · 0,50€/kWh DC - 0,35kWh AC
Repsol Lérida
50 kWRepsol - Ibil (ES) · 0.47€/kWh
Garaje Dalmau
50 kWIndependent
Parking Janot
22 kWZunder · 0,25€/kWh
Lidl Lérida
22 kWLidl · free
Mercadona Santa Cecilia
22 kWMercadona · 0,25€/kWh
Aldi Lérida
7 kWALDI SÜD (DE) · free
Narrow it down by fast or ultra-rapid, or pan the live map.
Network share in Lérida
Share of the 10 stations in Lérida. Independent and uncategorised sites are left out.