AgeVolt (SK)
Headquarters - · operates in SK
AgeVolt has 308 public charging points in Slovakia and Czechia. 300 are AC under 50 kW, 7 are 50-149 kW and 1 is 150 kW or faster.
How AgeVolt (SK) fits in
- Peak DC power
- 180 kW
- Supported connectors
- Headquarters
- -
- Operating regions
- SK
Locate a AgeVolt (SK) station
Filter the map by operator to see only AgeVolt (SK) sites in your country. Coverage data refreshes nightly from the source feeds.
Open the mapAgeVolt (SK) coverage: 308 public points across Slovakia and Czechia
AgeVolt runs 308 public charging points in Slovakia and Czechia, and the mix tells you what it is for. Three hundred of those points are AC at under 50 kW. Seven are 50 to 149 kW. One is 150 kW or faster. That is a top-up network for places you stop anyway, not a motorway sprint network.
Where the points are
Slovakia and Czechia. Within Slovakia, the busiest towns in our database are Bratislava with 42 points, Trnava with 16, Žilina with 11, Galanta with 10 and Poprad with 8. The rest is spread thinner, so do not assume a charger in every town you pass through.
The power mix, plainly
| Tier | Points | | --- | --- | | 150 kW+ | 1 | | 50 to 149 kW | 7 | | AC under 50 kW | 300 |
300 of 308 points are AC under 50 kW. Those are typically Type 2 connections at 7 to 22 kW, which means hours, not minutes. Plan on charging while the car sits: at work, at a hotel, at a shop, on the street overnight.
Eight points are DC fast charging. Seven of them sit in the 50 to 149 kW band and exactly one is 150 kW or above. One ultra-rapid point is a single stall in a 308-point network. Do not build a long drive around it. If you need a fast motorway stop, treat AgeVolt as a fallback and check what else is nearby before you commit.
Connectors you will meet
Type 2 tether, Type 2 socket only, and CCS on the DC points. Bring your own cable for the socket-only stalls. Some sites will not have one attached.
Practical notes
Check the price on the unit or in the operator's app before you plug in, since rates vary by site and by connector. Most operators take contactless bank card or their own app, and AgeVolt is likely to be one of those two, so have both ready. If a stall will not start, try another stall at the same site before you call anyone. Report the fault so it gets fixed.
Charging speed depends on your car as well as the point. A 22 kW AC stall will only give a car with a 11 kW onboard charger 11 kW.
- How many public charging points does AgeVolt have?
- 308 public points in our database, split between Slovakia and Czechia. Of those, 300 are AC under 50 kW, 7 are in the 50 to 149 kW band and one is 150 kW or faster. The count covers public charging points only.
- Where does AgeVolt charge in Slovakia?
- Bratislava has the most with 42 points, then Trnava with 16, Žilina with 11, Galanta with 10 and Poprad with 8. Outside those towns the network is thinner, so check the map for your route rather than assuming coverage.
- How fast can I charge on AgeVolt?
- Almost certainly at AC speed. 300 of the 308 points are under 50 kW, typically 7 to 22 kW, so expect hours for a full charge. Eight points are DC fast, seven at 50 to 149 kW and a single one at 150 kW or above.
- What connectors will I find at AgeVolt sites?
- Type 2 tethered, Type 2 socket only and CCS at the DC points. Socket-only stalls mean you use your own cable, so keep it in the car. CCS is for the DC points and the AC stalls will not take it.
- Can I use AgeVolt for a long road trip?
- Not as your main plan. With one point at 150 kW or above and seven at 50 to 149 kW, the fast options are scarce. It works better as a destination or overnight top-up. For a long drive, line up other networks along the route first.
- Do I need an app to start a charge?
- Most operators accept contactless bank card or their own app, so carry both and expect one of the two. Check the price shown in the app or on the unit before you plug in. If a stall will not start, try another one at the site and report the fault.