BC Hydro
Headquarters - 路 operates in CA
BC Hydro runs 211 public charging points in Canada: 4 ultra-rapid at 150 kW+, 167 rapid at 50-149 kW, 40 slower AC. CCS, CHAdeMO, Type 1 and NACS.
How BC Hydro fits in
- Peak DC power
- 180 kW
- Supported connectors
- Headquarters
- -
- Operating regions
- CA
Locate a BC Hydro station
Filter the map by operator to see only BC Hydro sites in your country. Coverage data refreshes nightly from the source feeds.
Open the mapBC Hydro charging coverage: 211 points, built around 50-149 kW
BC Hydro's public charging footprint in our database is 211 points, all in Canada, and it leans hard on rapid charging: 167 points at 50-149 kW. Only 4 points reach 150 kW or above, and 40 sit under 50 kW on AC. Surrey and Victoria hold 13 each. Here is what that mix means when you plan a stop, which connectors you will actually meet, and what to check before you plug in.
How big it is
211 public charging points, all in Canada. The towns with the most points in our database are Surrey and Victoria at 13 each, North Vancouver at 8, Vancouver at 7 and Burnaby at 5. Everything else is spread thinner. The network is concentrated rather than spread evenly, and point counts move, so treat these as a snapshot.
The power mix
Rapid charging is the backbone. 167 of the 211 points sit in the 50-149 kW tier, which covers a 20 to 40 minute stop for a lot of cars. Ultra-rapid is thin: 4 points at 150 kW or above. If you are counting on the fastest possible stop, confirm one of those four before you build a plan around it. The remaining 40 points are AC under 50 kW, better for a car parked a few hours than for a highway pause.
Connectors you will meet
CCS (Type 1), CHAdeMO, Type 1 (J1772) and NACS / Tesla Supercharger plugs all appear on their sites. That does not mean every stall carries all four. Read the label on the stall you pull up to, not the network name on the sign. Older CHAdeMO cars have a path here, and Tesla drivers may find NACS plugs at some stalls.
What it means in practice
Treat this as a top-up network, not a charging plaza. 167 rapid points is enough to cover real ground, and a 50-149 kW stall adds useful range in the time it takes to eat lunch. The 4 ultra-rapid points are the exception, not the norm, so do not assume 150 kW because you saw the name. The 40 AC points suit destination parking: a museum, a mall, an office.
Before you plug in
Payment handling varies. Many operators take a contactless bank card or their own app, so have both options ready. Check the price on the unit or in the app before you plug in, since per-kWh and per-minute rates are not in our data. If a stall is dead, try another stall at the same location and report it to the operator. Our numbers describe points, not uptime.
- Where does BC Hydro have charging points?
- All 211 points in our database are in Canada. The towns with the most are Surrey and Victoria at 13 each, then North Vancouver at 8, Vancouver at 7 and Burnaby at 5. The remaining points sit in smaller numbers across other towns we record. If you are planning around a specific address, check our listing rather than assuming the town total applies to the block you are heading for.
- How fast are BC Hydro chargers?
- Most of the network is rapid: 167 of 211 points sit between 50 and 149 kW. That covers a 20 to 40 minute stop for many cars. Ultra-rapid is rare at 4 points of 150 kW or above. The last 40 points are AC under 50 kW, which suits a long parking stop rather than a quick highway pause.
- Which connectors will I find?
- CCS (Type 1), CHAdeMO, Type 1 (J1772) and NACS / Tesla Supercharger plugs are all listed on their sites. Coverage per stall is not guaranteed, so look at the label on the unit before you park and start a session. If your car takes CHAdeMO or NACS, that listing is worth confirming stall by stall.
- How many ultra-rapid points are there?
- Four. Out of 211 public points, 4 deliver 150 kW or above. The other 167 rapid points run 50-149 kW, and 40 are AC under 50 kW. If your car charges fastest above 150 kW, plan around those four locations or accept a slower session elsewhere. Do not round this tier up when you read marketing pages.
- Do I need an app to pay?
- Our data does not record app names, card schemes or tariffs, so we cannot tell you which one applies at a given stall. In general, most operators accept a contactless bank card or their own app. Check the price shown on the unit or in the app before you plug in, because per-kWh and per-minute rates differ by site and are not in our database.
- Can I rely on BC Hydro for a long drive?
- Partly. 167 rapid points at 50-149 kW is usable density for en-route top-ups, and rapid stalls are the bulk of the network. The limit is speed: only 4 points clear 150 kW. Build your plan around 50-149 kW stops and treat the ultra-rapid tier as a bonus you confirm in advance, not a default.