PowerGo
Headquarters - · operates in DK
PowerGo has 1,003 public charging points in six countries. 837 are AC under 50 kW, 107 rapid, 59 ultra-rapid. What that mix means for drivers.
How PowerGo fits in
- Peak DC power
- 400 kW
- Supported connectors
- Headquarters
- -
- Operating regions
- DK
Locate a PowerGo station
Filter the map by operator to see only PowerGo sites in your country. Coverage data refreshes nightly from the source feeds.
Open the mapPowerGo charging network: 1,003 points, 837 of them AC under 50 kW
PowerGo's public charging network runs to 1,003 points across six countries, and 837 of them are AC at under 50 kW. That makes it a destination and overnight network, not a road trip one. Here is the power split, the connectors you will meet, and what to check before you plug in.
How big the network is
PowerGo lists 1,003 public charging points in our database, spread across six countries: Denmark, the Netherlands, Spain, Germany, Belgium and Bosnia and Herzegovina. The busiest towns are all Danish. Randers has 90 points, Næstved 76, Thisted 56, Ikast 44 and Ballerup 28. Those five towns alone account for 294 points, close to a third of the network. If you drive in Denmark you are most likely to find one. In the other five countries the points are thinner on the ground, so check the map before you plan a stop around a stall.
What the power mix means
837 of the 1,003 points are AC at under 50 kW. That is the centre of gravity here, typically Type 2 at 7 to 22 kW. Think destination charging: a car park, a workplace, a kerb outside a flat, an overnight stop. You plug in, walk away, come back hours later.
The DC side is small. 107 points are rapid at 50 to 149 kW. 59 are ultra-rapid at 150 kW and up. That is 166 points at 50 kW or above, about one in six. They are handy when one sits where you were already going. They are not a spine you can build a long drive around, so if your route needs fast top-ups, filter for 50 kW and above and check each stop in advance.
Connectors you will meet
Four connector types show up on PowerGo sites: Type 2 tethered, Type 2 socket only, CCS and CHAdeMO. Socket-only Type 2 means bringing your own cable. CCS covers most modern EVs on the DC points. CHAdeMO serves older Japanese cars, and there are fewer of those stalls.
Before you plug in
Payment setup varies by site and country. Most operators take a contactless bank card at the unit or run their own app, so have both ready. Read the price on the unit or in the app before you start, because rates and any session fees differ between countries. If a stall is dead, move to the next one and tell the operator.
- Which countries does PowerGo cover?
- Six: Denmark, the Netherlands, Spain, Germany, Belgium and Bosnia and Herzegovina. The busiest towns in our database are all Danish. Randers has 90 points, Næstved 76, Thisted 56, Ikast 44 and Ballerup 28. Those five towns add up to 294 points, which is close to a third of the whole network. Outside Denmark the points are more scattered, so check the map for your area before you rely on one.
- How fast are PowerGo chargers?
- Mostly slow. Of 1,003 public points, 837 are AC at under 50 kW, usually Type 2 somewhere between 7 and 22 kW. Another 107 are rapid at 50 to 149 kW, and 59 are ultra-rapid at 150 kW and up. That leaves 166 points at 50 kW or above, roughly one in six. Plan on hours for a meaningful top-up on the AC stalls.
- Which connector do I need for a PowerGo charger?
- Four types appear on their sites: Type 2 tethered, Type 2 socket only, CCS and CHAdeMO. Most modern EVs use Type 2 for AC charging and CCS for DC. The socket-only Type 2 stalls have no cable attached, so bring your own. CHAdeMO appears too, mainly for older Japanese cars, but expect fewer of those stalls than CCS.
- Can I use PowerGo for a long road trip?
- Not as your main plan. Only 166 of the 1,003 points deliver 50 kW or more, and 59 of those are 150 kW and up. That is a thin fast-charging footprint across six countries. Use it where a rapid point happens to sit on your route, and line up other networks for the corridor miles. The AC majority is for parking, not passing through.
- Do I need to bring my own charging cable?
- Sometimes. PowerGo sites include both Type 2 tethered connectors, which have the cable attached, and Type 2 socket only stalls, which do not. If you land on a socket-only stall without a cable, you cannot charge there. Carrying a Type 2 cable in the boot covers that case, and it costs you nothing at the tethered stalls.
- What should I do if a PowerGo charger will not start?
- Try the next stall on the same site first, since a single dead unit is more common than a dead site. Check that the price and any session fee shown on the unit or in the app match what you expect before retrying. If nothing works, note the stall number and contact the operator through the number or app listed on the unit, then find another charge point nearby.