chargevu
400 kW peakstableGB1,174 stations indexed

Total Energies (UK)

Headquarters - 路 operates in GB

Total Energies runs 1,174 public charging points across GB and Luxembourg, but just 3 are rapid or faster. 1,171 are AC top-up points, mostly in London.

At a glance

How Total Energies (UK) fits in

Peak DC power
400 kW
Supported connectors
Headquarters
-
Operating regions
GB
Find one

Locate a Total Energies (UK) station

Filter the map by operator to see only Total Energies (UK) sites in your country. Coverage data refreshes nightly from the source feeds.

Open the map
Network overview

Total Energies charging: 1,174 points, almost all of them slow AC

Total Energies runs 1,174 public charging points in Great Britain and Luxembourg, and 1,171 of them are AC points under 50 kW. One point is ultra-rapid. Two are rapid. If you are hunting for a fast charge on a motorway run, this is not the network for that job. If you want somewhere to leave the car for a few hours while you shop, work or sleep, it is.

Where the points are

The network holds 1,174 public charging points across Great Britain and Luxembourg. London dominates. It appears twice in our town data, once as "London" with 439 points and again as "LONDON" with 74, which is a naming quirk rather than two separate networks. Camden Town adds 92, Islington 59 and Ealing 57. Those five rows account for 721 points, and 513 of them carry a London label. Outside the capital the network thins out fast.

The power split is not close

One point delivers 150 kW or more. Two sit in the 50 to 149 kW band. The remaining 1,171 are AC points under 50 kW, typically 7 to 22 kW Type 2. That is 3 of 1,174 points at 50 kW or above. No rounding changes the picture: this is a slow AC network with a token rapid presence, not a rapid network with some AC in it.

What that means on a drive

Plan this network around parking, not around driving. These are the posts you plug into while the car sits: on-street, overnight, at a workplace, at a destination. They are not the posts you build a motorway journey around. If you need to add serious range in twenty minutes, look at a different operator and come back here when you have time to spare.

Connectors you will meet

Four connector types are listed on their sites: Type 2 (socket only), Type 1 (J1772), BS1363 three-pin 13 amp, and CCS (Type 2). Socket only means the post gives you a socket, not a tethered cable, so bring your own Type 2 lead. The three-pin option is a household plug in public form, the slowest of the lot, best treated as a top-up of last resort. CCS appears on the list, so CCS drivers are not shut out, but with only three points at 50 kW or above, expect AC speeds.

Before you plug in

Most operators take a contactless bank card or their own app. Check the price shown on the unit or in the app before you connect, since it is the displayed price that applies. If a stall is dead, try another stall on the same site first. If the whole site is down, contact the operator and move on.

FAQ
Where does Total Energies charge in the UK?
The network covers Great Britain and Luxembourg, with 1,174 public points in total. The density is heavily London: 439 points listed as London, 74 more under a second LONDON label, plus Camden Town at 92, Islington at 59 and Ealing at 57. Those five rows alone come to 721 points. Elsewhere the coverage is much thinner, so check the map before you rely on it for a specific trip.
How fast are the charge points?
Almost all of them are slow. Of 1,174 points, 1,171 are AC points under 50 kW, typically 7 to 22 kW Type 2. Two points fall in the 50 to 149 kW rapid band, and exactly one delivers 150 kW or more. That is three points out of 1,174 at 50 kW or above. Treat this as a top-up network, not a fast-charging one.
Which connectors will I find?
Four types are listed on their sites: Type 2 (socket only), Type 1 (J1772), BS1363 three-pin 13 amp and CCS (Type 2). The Type 2 posts are socket only, meaning no tethered cable, so you need your own lead. The three-pin option is the slowest and works as an emergency trickle. CCS is listed, but with three points at 50 kW or above you should not count on a fast CCS session.
Can I use this network for a long motorway trip?
Not realistically. With three points at 50 kW or above across 1,174, there is no rapid corridor here to plan a long drive around. A motorway journey needs guaranteed fast stops, and this network does not offer that. Use it for what it is good at: leaving the car plugged in for hours at a destination, at work, or on the street overnight, then charging fast elsewhere when you are moving.
Do I need to bring my own cable?
Yes, for the Type 2 posts. They are listed as socket only, which means the post has a socket rather than a cable attached to it, so a Type 2 driver supplies the lead. If your car came with a Type 2 cable, keep it in the boot. Tethered cables are what you would expect on rapid units, and there are only three of those here.
What will a charge cost, and what if a post is broken?
We do not hold tariff data for this operator, so check the price shown on the unit or in the app before you plug in, and treat that displayed price as the one that applies. If a stall does not start, try another stall on the same site before assuming the whole location is down. If nothing works, contact the operator and charge somewhere else.
By country

Total Energies (UK) by country

Compare

Other networks

All networks