chargevu
0 of 11 available3.7 kW peakChargelab

45 Federal Alley

45 Federal Aly, Asheville, US

11 ports

Ports at this station

  • Type 1 (J1772)

    11× · up to 3.7 kW

    Unknown

Station info

Address
45 Federal Aly, 28801, Asheville, NC, United States
Coordinates
35.58925, -82.55571
Last verified
2025-11-11

About this stop

This Chargelab station at 45 Federal Alley in Asheville offers 4 kW peak AC charging, best suited for drivers who need a local top-up rather than a rapid charge. It provides Type 1 (J1772) connectors. The station is currently reported as operational.

A 4 kW charging speed means you will add about 15 to 20 miles of range per hour of charging. This makes it a practical option for EV charging in Asheville when you have time to spare, like during a longer stop at a business or residence. It is not intended for quick road trip charging where every minute counts. Plan accordingly for your charging needs at this location.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at 45 Federal Alley.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of 45 Federal Alley.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB