chargevu
1 of 1 available3.7 kW peak(Business Owner at Location)

Abwasser- und Umweltverband Chiemsee

Römerstraße 10-12, Seeon-Seebruck, DE

1 port

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 3.7 kW

    Available

Station info

Address
Römerstraße 10-12, 83358, Seeon-Seebruck, Landkreis Traunstein, Germany
Total points
1
Coordinates
47.93331, 12.47631
Last verified
2016-11-17

About this stop

This 4 kW AC charging station is best suited for drivers who need a slow top-up rather than a quick charge. Located in Seeon-Seebruck, DE, it is operated by an independent or unlisted entity. The single charging point uses a CEE 7/4 (Schuko) Type F connector.

EV charging in Seeon-Seebruck at this site offers a peak power of 4 kW. This means adding about 10-15 miles of range per hour of charging. It is more appropriate for local use or for topping off while visiting the area, rather than as a primary stop on a long road trip. The station is currently reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Abwasser- und Umweltverband Chiemsee.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Abwasser- und Umweltverband Chiemsee.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB