ACCO Engineering
888 E Walnut Ave, Pasadena, US
26 ports
Ports at this station
- Unknown
Type 1 (J1772)
26× · up to 3.7 kW
Station info
- Address
- 888 E Walnut Ave, 91101, Pasadena, CA, United States
- Website
- powerflex.com
- Coordinates
- 34.14899, -118.13349
- Last verified
- 2025-11-11
About this stop
ACCO Engineering in Pasadena offers Level 2 AC charging from Powerflex. It provides 4 kW peak power, suitable for drivers prioritizing a slower, local top-up over rapid charging. The station uses Type 1 (J1772) connectors, common on many electric vehicles. EV charging in Pasadena includes this site.
At 4 kW peak, this station delivers roughly 15-20 miles of range per hour of charging. This speed is best for overnight charging, or for topping up while you are parked for several hours. It is not designed for quick, on-the-go charging needed for long road trips. The station is currently reported as operational.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of ACCO Engineering.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB