chargevu
4 of 4 available7.4 kW peakALDI SÜD (DE)

Aldi Motril

Aldi Motril, Motril, ES

4 ports

Ports at this station

  • Type 2

    2× · up to 7.4 kW

    Available
  • Schuko (CEE 7/4)

    2× · up to 2.3 kW

    Available

Station info

Address
Aldi Motril, 18600, Motril, Andalusia, Spain
Total points
2
Coordinates
36.74313, -3.52670
Last verified
2022-09-30

About this stop

This ALDI SÜD station in Motril offers EV charging for drivers needing a slower AC top-up. It provides 7 kW peak power across two charging points. Connectors available are Type 2 (socket only) and CEE 7/4 Schuko (Type F).

At 7 kW, expect to add about 30 miles of range per hour of charging. This makes it ideal for local errands and top-ups rather than long road-trip rapid charging. EV charging in Motril can be found here for shoppers. The station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Aldi Motril.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Aldi Motril.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB