chargevu
13 of 13 available22 kW peakPowerDot (Es)

Aquopolis Cullera

CV-502, Cullera, ES

13 ports · 0,40€/kWh AC

Ports at this station

  • Type 2

    10× · up to 7.4 kW

    Available
  • Type 2

    3× · up to 22 kW

    Available

Station info

Address
CV-502, 46400, Cullera, Comunitat Valenciana, Spain
Total points
13
Coordinates
39.18509, -0.25484
Last verified
2023-06-16

About this stop

Aquopolis Cullera is an EV charging site in Cullera, Spain. PowerDot operates 13 charging points here, all equipped with Type 2 sockets. The maximum output is 22 kW AC, which is considered slower charging. This means a typical electric car might add around 75 miles of range in an hour.

This station is likely best for local drivers topping up or for travelers needing a charge during their stay in Cullera. While 22 kW is not the fastest option available for EVs, it provides a steady rate for extending your car's range. The cost is 0,40€ per kWh for AC charging. The reported status is operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Aquopolis Cullera.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Aquopolis Cullera.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB