chargevu
0 of 2 available3.7 kW peakChargePoint

AT&T ADDISON

5100 Belt Line Road, Dallas, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
5100 Belt Line Road, 75254, Dallas, TX, United States
Access
24 hours daily
Coordinates
32.95391, -96.82141
Last verified
2025-11-11

About this stop

ChargePoint operates this EV charging station at AT&T ADDISON in Dallas. The site has a 4 kW peak power output, which is a slower AC charging speed. All charging points use the standard Type 1 (J1772) connector. The station is currently reported as operational.

This station is best suited for local charging or topping up your battery rather than long road trips. A 4 kW peak means you will add about 12-16 miles of range per hour of charging, depending on your vehicle. This is enough to add significant range if you plan to park for a few hours, making it a convenient option for EV charging in Dallas if you are in the Dallas area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at AT&T ADDISON.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of AT&T ADDISON.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB