chargevu
0 of 2 available3.7 kW peakChargePoint

BELLINGHAM CITY MILL 1

1011 Mill Avenue, Bellingham, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
1011 Mill Avenue, 98225, Bellingham, WA, United States
Access
24 hours daily
Coordinates
48.72083, -122.50419
Last verified
2025-11-11

About this stop

This ChargePoint station uses Type 1 (J1772) connectors, compatible with most EVs sold in North America. It is currently operational, offering Level 2 AC charging. The peak power output is 4 kW, which provides a slower rate of charging compared to DC fast chargers. This station is one of the options for EV charging in Bellingham.

For most EVs, 4 kW peak charging adds about 10-15 miles of range per hour. This rate makes BELLINGHAM CITY MILL 1 suitable for topping up a battery while parked locally or during shorter stops, rather than for quick charging on a long road trip. Plan accordingly for the time needed to gain significant range.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at BELLINGHAM CITY MILL 1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of BELLINGHAM CITY MILL 1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB