chargevu
0 of 4 available3 kW peakChargePoint

BLUE_GREEN_PRKG

750 N San Vicente Blvd, West Hollywood, US

4 ports

Ports at this station

  • Type 1 (J1772)

    4× · up to 3 kW

    Unknown

Station info

Address
750 N San Vicente Blvd, 90069, West Hollywood, CA, United States
Access
24 hours daily
Coordinates
34.08464, -118.38368
Last verified
2019-12-24

About this stop

This ChargePoint station at BLUE_GREEN_PRKG in West Hollywood provides Type 1 (J1772) connectors. Cars with this plug type can connect here. The network operator is ChargePoint. Power delivery peaks at 3 kW, which is slower AC charging. This station is best suited for local top-ups or longer parking sessions rather than quick road-trip charging. To put 3 kW into perspective, charging a typical electric car from empty to full could take 8 to 12 hours. This type of charging is ideal for overnight parking or when you have several hours to spare while visiting West Hollywood.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at BLUE_GREEN_PRKG.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of BLUE_GREEN_PRKG.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB