chargevu
0 of 5 available3.7 kW peakChargeSmart EV

BP3 Springside Development

44 Springside Avenue, Poughkeepsie, US

5 ports

Ports at this station

  • Type 1 (J1772)

    5× · up to 3.7 kW

    Unknown

Station info

Address
44 Springside Avenue, 12603, Poughkeepsie, NY, United States
Access
24 hours daily
Coordinates
41.69842, -73.90232
Last verified
2025-11-11

About this stop

For drivers needing a slower AC charge in Poughkeepsie, the BP3 Springside Development station offers 4 kW peak power. It uses Type 1 (J1772) connectors. This station is operated by ChargeSmart EV.

At 4 kW, expect to add about 12-15 miles of range per hour of charging. This is best suited for local drivers topping up their battery rather than a quick road trip stop. It is currently operational. EV charging in Poughkeepsie includes options like this one for everyday needs.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at BP3 Springside Development.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of BP3 Springside Development.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB