chargevu
0 of 2 available3.7 kW peakBlink Charging

Building 200

200 Bushwood Court, Summerville, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
200 Bushwood Court, 29486, Summerville, SC, United States
Access
24 hours daily
Coordinates
33.05504, -80.15652
Last verified
2025-11-11

About this stop

This Blink Charging station at Building 200 in Summerville, US, provides Type 1 (J1772) connectors. These fit most older American EVs and all new Japanese and European models. The station is currently operational and offers peak power of 4 kW. This is a slower AC charging speed. Expect to add about 10 to 15 miles of range per hour of charging. This speed makes it best suited for topping up while parked locally rather than a primary stop for long-distance road trips. Finding EV charging in Summerville can be straightforward with options like this one. It is a practical choice for drivers needing a charge during their day.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Building 200.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Building 200.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB