chargevu
0 of 2 available3.7 kW peakBlink Charging

Building 4000

100 Flint Pond Circle, Shrewsbury, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
100 Flint Pond Circle, 1545, Shrewsbury, MA, United States
Access
24 hours daily
Coordinates
42.24740, -71.72244
Last verified
2025-11-11

About this stop

Drivers needing a slower AC charge can find Building 4000 in Shrewsbury. Blink Charging operates this station, which offers a peak power of 4 kW. All charging points use the standard Type 1 (J1772) connector. This station is currently operational.

At 4 kW, this is best suited for drivers needing a local top-up rather than a rapid replenishment for a long road trip. For context, adding about 10 to 15 miles of range per hour is typical for a 4 kW charger. It represents one option for EV charging in Shrewsbury, useful for residents or those with flexible schedules. Its slow speed means it is unlikely to be the fastest way to gain miles.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Building 4000.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Building 4000.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB