chargevu
0 of 2 available3.7 kW peakIndependent

Capital Regional Development Authority (CRDA)

105 Columbus Blvd, Hartford, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
105 Columbus Blvd, 06103, Hartford, CT, United States
Access
6am-12am daily
Coordinates
41.76329, -72.67016
Last verified
2025-11-11

About this stop

For drivers needing a slower charge, the Capital Regional Development Authority (CRDA) station in Hartford offers 4 kW peak AC power. The operator is independent or unlisted, and the number of charging points is unstated. Connectors on site are exclusively Type 1 (J1772).

This CRDA station is best suited for local EV charging in Hartford or for drivers with ample time. A 4 kW peak rate means adding roughly 12-16 miles of range per hour of charging, depending on your vehicle's efficiency. It is an operational site, providing a steady option for drivers prioritizing cost-effectiveness over speed.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Capital Regional Development Authority (CRDA).

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Capital Regional Development Authority (CRDA).

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB